{"id":20635,"date":"2021-12-10T12:59:58","date_gmt":"2021-12-10T12:59:58","guid":{"rendered":"http:\/\/denyalake.ro\/?p=20635"},"modified":"2026-03-04T11:37:13","modified_gmt":"2026-03-04T09:37:13","slug":"danya-cebus-a-dat-startul-rezervarilor-pentru-cel-de-al-patrulea-bloc-denya-forest-din-timisoara","status":"publish","type":"post","link":"https:\/\/denyalake.ro\/en\/danya-cebus-a-dat-startul-rezervarilor-pentru-cel-de-al-patrulea-bloc-denya-forest-din-timisoara\/","title":{"rendered":"Danya Cebus has opened reservations for the fourth Denya Forest building in Timi\u0219oara"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Danya Cebus has launched the sales process and opened reservations for the apartments to be built as part of the fourth phase of the Denya Forest residential complex in Timi\u0219oara. As with previous phases, Hitch&amp;Mosher, the project\u2019s exclusive agent, will handle the sale of the apartments.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The fourth phase of the residential complex\u2019s development consists of a building with a layout of ground floor + basement + 10 above-ground floors + 11 recessed floors, featuring 116 apartments with high-quality finishes and underfloor heating. Block IV of Denya Forest will include 1.5-, 2-, 2.5-, and 3-bedroom apartments, as well as penthouse apartments, varying in layout and size to meet the diverse needs and budgets of future residents.\u00a0<\/span><\/p>\n<p><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"aligncenter size-full wp-image-20637\" src=\"http:\/\/denyalake.ro\/wp-content\/uploads\/2021\/12\/Foto-Denya-Forest-2.jpg\" alt=\"\" title=\"\" srcset=\"https:\/\/denyalake.ro\/wp-content\/uploads\/2021\/12\/Foto-Denya-Forest-2.jpg 1920w, https:\/\/denyalake.ro\/wp-content\/uploads\/2021\/12\/Foto-Denya-Forest-2-250x141.jpg 250w, https:\/\/denyalake.ro\/wp-content\/uploads\/2021\/12\/Foto-Denya-Forest-2-700x394.jpg 700w, https:\/\/denyalake.ro\/wp-content\/uploads\/2021\/12\/Foto-Denya-Forest-2-768x432.jpg 768w, https:\/\/denyalake.ro\/wp-content\/uploads\/2021\/12\/Foto-Denya-Forest-2-1536x864.jpg 1536w, https:\/\/denyalake.ro\/wp-content\/uploads\/2021\/12\/Foto-Denya-Forest-2-18x10.jpg 18w, https:\/\/denyalake.ro\/wp-content\/uploads\/2021\/12\/Foto-Denya-Forest-2-120x68.jpg 120w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p><span style=\"font-weight: 400;\">\u201cWith the development of the third phase of the project, we decided to rename Adora Forest by Danya Cebus to Denya Forest. We wanted the complex to hold a place of honor in our portfolio of developed real estate projects and to be part of the Danya Cebus family. We are proud to be part of this project and to be able to build your future homes in the green heart of Timi\u0219oara, in such a special location,\u201d said Shlomi Mintzer, CEO of Danya Cebus.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For the project\u2019s launch phase, promotional prices start at 1,350 euros per square meter of usable space, plus 5% VAT. Denya Forest offers the best value for money\u2014in terms of price, square footage, and quality\u2014for its 2.5-bedroom apartments, which include an extra room at no additional cost. <\/span><span style=\"font-weight: 400;\">This room can serve multiple purposes, ranging from a children\u2019s room or playroom to an office or workshop for pursuing hobbies\u2014something we all need so much right now.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cWe expect the fourth phase of the Denya Forest residential complex to attract interest from potential customers. We have prepared special offers, valid during the project\u2019s launch period. We are already in advanced discussions regarding the signing of the first reservation contracts, and we aim to meet our clients\u2019 expectations regarding their future homes,\u201d said Mihaela Matei, consultant at Hitch&amp;Mosher and exclusive agent for Denya Forest.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The Denya Forest residential complex offers all the benefits of living near the Green Forest, providing nature lovers with an active lifestyle. The Denya Forest Timi\u0219oara project was launched in 2013 and currently comprises three buildings, the first two of which are already in use and fully occupied, while the third is scheduled for completion in the summer of 2022. Construction work on Block IV has already begun, with work currently underway on the basement level. The estimated completion date is April 2023.<\/span><\/p>\n<p><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"aligncenter size-full wp-image-20638\" src=\"http:\/\/denyalake.ro\/wp-content\/uploads\/2021\/12\/Foto-Denya-Forest-3.jpg\" alt=\"\" title=\"\" srcset=\"https:\/\/denyalake.ro\/wp-content\/uploads\/2021\/12\/Foto-Denya-Forest-3.jpg 1920w, https:\/\/denyalake.ro\/wp-content\/uploads\/2021\/12\/Foto-Denya-Forest-3-250x141.jpg 250w, https:\/\/denyalake.ro\/wp-content\/uploads\/2021\/12\/Foto-Denya-Forest-3-700x394.jpg 700w, https:\/\/denyalake.ro\/wp-content\/uploads\/2021\/12\/Foto-Denya-Forest-3-768x432.jpg 768w, https:\/\/denyalake.ro\/wp-content\/uploads\/2021\/12\/Foto-Denya-Forest-3-1536x864.jpg 1536w, https:\/\/denyalake.ro\/wp-content\/uploads\/2021\/12\/Foto-Denya-Forest-3-18x10.jpg 18w, https:\/\/denyalake.ro\/wp-content\/uploads\/2021\/12\/Foto-Denya-Forest-3-120x68.jpg 120w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/p>","protected":false},"excerpt":{"rendered":"Danya Cebus a demarat procesul de v\u00e2nzare \u0219i a deschis rezerv\u0103rile pentru apartamentele ce vor fi construite \u00een cadrul celei de-a patra faze a complexului reziden\u021bial Denya Forest din Timi\u0219oara. De v\u00e2nzarea apartamentelor, la fel ca \u0219i \u00een fazele anterioare, se va ocupa Hitch&amp;Mosher, agentul exclusiv al proiectului.\u00a0 Cea de-a patra etap\u0103 de dezvoltare a&#8230; <a class=\"view-article\" href=\"https:\/\/denyalake.ro\/en\/danya-cebus-a-dat-startul-rezervarilor-pentru-cel-de-al-patrulea-bloc-denya-forest-din-timisoara\/\">View Article<\/a>","protected":false},"author":1,"featured_media":29410,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[],"class_list":["post-20635","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noutati"],"_links":{"self":[{"href":"https:\/\/denyalake.ro\/en\/wp-json\/wp\/v2\/posts\/20635","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/denyalake.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/denyalake.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/denyalake.ro\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/denyalake.ro\/en\/wp-json\/wp\/v2\/comments?post=20635"}],"version-history":[{"count":1,"href":"https:\/\/denyalake.ro\/en\/wp-json\/wp\/v2\/posts\/20635\/revisions"}],"predecessor-version":[{"id":20639,"href":"https:\/\/denyalake.ro\/en\/wp-json\/wp\/v2\/posts\/20635\/revisions\/20639"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/denyalake.ro\/en\/wp-json\/wp\/v2\/media\/29410"}],"wp:attachment":[{"href":"https:\/\/denyalake.ro\/en\/wp-json\/wp\/v2\/media?parent=20635"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/denyalake.ro\/en\/wp-json\/wp\/v2\/categories?post=20635"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/denyalake.ro\/en\/wp-json\/wp\/v2\/tags?post=20635"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}